Project Overview

 

This project involves a 3PL cold storage warehouse in Kazakhstan, primarily leased to food companies for frozen food storage.

With a total area of 600 m² and a clear warehouse height of 8 meters, the facility needed to maximize storage capacity while keeping the investment cost under control. The stored goods are palletized, with a maximum load of 1,000 kg per pallet.

To make better use of the available space, GD implemented a combined storage solution using shuttle racking and selective pallet racking, achieving over 2,500 pallet positions within the existing warehouse.

Combined Storage Solution

 

Project Specifications

 

Item

Specifications

Industry

Third-Party Logistics (3PL)

Application

Frozen Food Storage

Location

Kazakhstan

Warehouse Area

600 m²

Warehouse Height

8 m

Maximum Pallet Load

1,000 kg

Storage Capacity

2,500+ Pallet Positions

Storage System

Shuttle Racking + Selective Pallet Racking

Number of Shuttles

2

Shuttle Speed

Load: 1m/s; Unload: 1.2m/s

Operating Temperature

-25°C

 

Cold Storage Shuttle (1)
Cold Storage Shuttle (1)
cold storage shuttle (2)

 

Storage Solution

Considering the warehouse layout, available height, and storage requirements, GD designed a combination of shuttle racking and selective pallet racking to maximize the use of the existing warehouse space.

  • Main Storage Area: Four-level shuttle racking was installed across the main storage area, providing high-density pallet storage and making full use of the available vertical space.
  • Wall-Side Storage: Selective pallet racking was arranged along the warehouse walls to utilize the remaining space and accommodate additional pallet positions.
  • Cold Storage Operation: Two shuttles designed for low-temperature operation were deployed to handle pallet movement within the shuttle racking system. They can operate reliably at temperatures as low as -25°C.

This combined layout provides more than 2,500 pallet positions within the 600 m² facility, increasing storage density while making efficient use of the warehouse footprint and project investment.

Project Construction Site

 

Project Results

 

The new storage system delivered significant improvements in warehouse capacity and operational performance:

  • 3× Storage Capacity: Storage capacity increased to three times its previous level within the existing warehouse footprint.
  • 35% Higher Operational Efficiency: Automated pallet handling improved material flow and reduced manual handling requirements.
  • Optimized Space Utilization: The combination of shuttle racking and selective pallet racking made effective use of both the main storage area and wall-side space.

The solution enables the 3PL operator to accommodate significantly more frozen food inventory within the existing facility while improving day-to-day warehouse operations and investment efficiency.

Shuttle Operating at -25°C

 

Four-Level Shuttle Racking
On-Site Installation (1)
On-Site Installation (2)
On-Site Installation (3)

 